A SERVICE OF

logo

119
Figure 5.11.17
5. A new target will be added in this replication job as a redundancy path.
Figure 5.11.18
Configure the replication job to run by schedule
1. Click “Schedule” in the operation menu of the replication job.
Figure 5.11.19